Website Updates

05 November 2005: I finally had the opportunity to complete what I had started last weekend. I've uploaded the updaged Interstate and US Highway Routelogs along with a new links page and an updated main page to reflect the updates. I've begun work on the M-Routes, but probably won't have too much posted for a while. My goal is to have a preliminary exit guide for a freeway (either the Davison or I-696) by the end of the month, just to see how it looks on the web. Regardless, the Routelog is still the priority, so check there for updates periodically. Blessings.

30 October 2005: Well, I finally had some time for an update. I completed the first incarnation of the US Highways page in the routelog, added the County-Designated Highways to the "Other" category and added links to Dan Garnell's wonderful "Michigan Ends" websites for the highways currently completed.
Blessings.

24 September 2005: After an incredibly and tiring summer, I started school again - hopefully my final year of undergraduate work. I was able today to take a break from studying and update the main index page, some of the route log, and create a very generic template for the "Special Sections and Features" index page. An update page was finally uploaded, though I'm not quite sure how I overlooked it each time I updated the website. I hope to clean that page up within short order. Updates will be sparatic, and probably "clumped" together, as I have time to work on this during my senior year.
God bless!

23 May 2005: Cleaned up the formatting and html code on all the pages a bit. The changes should make the pages more aesthetically pleasing, while hoping to be unique enough in design. This will probably be the last update until after Labor Day due to summer (not being in school) and the initial burst of busy days at the beginning of the next school year.

17 & 21 May 2005: After a long stint of projects and finals, I finally had some free time to finish the first version of the Interstate Highways page. Next up, the US Highways page. Since I will be moving across town this weekend, I probably will not have the time to update it before the end of the month.

18 April 2005: Complete are the 2di Interstate Highways (at least a first draft). Yes, it has been slow, but I've had three research projects to finish and a recital. Further work will be done on the page after the next round of school duties: another research project and two more recitals.

06 April 2005: Posts entrance page to routelog and begins work on Interstate Highways page.

27 March 2005: I did some touchup on the main pages and hope to have the routelog template functional (though incomplete) by 10 April. This marks the first "true" day of the Detroit Highways page.